RV Renovators – Days 27-28 – The Best Laid Plans

I’m sure you’ve heard this before – the best laid plans of mice and men go awry. Well, it’s true – at least in this case. Monday morning I was optimistic about getting the job finished. I was sure we would pull out of RV Renovators no later than Tuesday, possibly even by the close of business on Monday.

On Sunday, our painter, Steve, told me he had a few small touch-ups to do on Monday, then another clear coat. After that it only needed to be blocked and buffed. Izzy has some sealant to apply and the slide topper needed to be installed.

Around 9am, I realized we might be in trouble. I went outside and saw John sanding the clear coat. I asked him what was up. He said he didn’t think Steve was coming in, he had called in sick. John said he was going to sand then buff the clear coat. I told him that’s not what Steve intended. I showed him a few areas that Steve wanted to touch up. I also told him Steve only applied a light clear coat to seal the paint before it rained and he was going to clear coat it again.

Here’s an example of the small imperfections Steve wanted to touch up

John said he would handle it. He cut through the clear coat and masked and painted several areas. He was still working on it when I left around 3pm to go to Viewpoint RV Resort to choose our site and also inform them that I may not be out of the repair shop on Tuesday.

From there, I stopped at Red, White and Brew and had a cold one with my friends Pat and Leendert.  When I got back to the coach a little past 5pm, John was gone. He had sprayed clear coat and at first I thought he was done. Then I looked closer and felt sick to my stomach. The paint didn’t have small touch ups – it had major flaws now. John had screwed it up completely.

Bad tape job

More bad masking

Waves sanded into the trim

Tuesday morning I had a heated conversation with the owner, Monte. I was totally frustrated. All the hard work done by Izzy, Armando and Steve had gone by the wayside. In the end, people won’t see the time and talent that went into the job – they will only judge the job by the finish applied. I’m sure it was disappointing for Steve, too. He had to sand out the mistakes and start taping all over again.

Masking and re-shooting the base coat

He spent about five hours taping and applying colors again.

More taping

Around 3pm he was ready to apply clear coat. He rescued the paint job, but it has a few minor flaws that weren’t there on Sunday.

Clear coat applied

Oh well, the rest of paint on the coach isn’t perfect either. I’m not going to lose any sleep over it at this point. I’m hoping there are no more glitches today and we can get out of here.

We’re looking forward to moving into an actual RV Resort with a patio outside our door, pickleball courts and swimming pools. I’ll have our trailer and can set up the barbeque and Traeger smoker/grill. The weather looks good for the rest of the week – highs in the mid 70s and sunny. They’re calling for rain in the area over the weekend though.